Refine your search:     
Report No.
 - 
Search Results: Records 1-6 displayed on this page of 6
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Proposal of maintenance rationalization for next-generation fast reactors based on the analysis of the prolonged maintenance of the prototype fast-breeder reactor in Japan, "Monju", 1; Analysis of plant schedule of "Monju" in cold shutdown

Hashidate, Ryuta; Toyota, Kodai; Takahashi, Keita; Yada, Hiroki; Takaya, Shigeru

Hozengaku, 19(4), p.115 - 122, 2021/01

In order to improve both safety and economic efficiency of a nuclear power plant, it is necessary to realize rational maintenance based on characteristics of the plant. The prototype fast-breeder reactor in Japan, Monju, spent most of the year for the maintenance. Thus, it is important to identify causes of the prolonged maintenance of Monju and to investigate countermeasures for implementation of rational maintenance of next-generation fast reactors. In this study, the authors investigated the causes of the prolonged maintenance of Monju during reactor cold shutdown based on the plant schedule of Monju. In addition, we proposed the maintenance optimization idea for next-generation fast reactors to solve the revealed issues.

Oral presentation

Analysis of issues related to maintenance period of the fast breeder prototype reactor Monju, 1; Analysis of plant operation for maintenance of cold shutdown Monju

Hashidate, Ryuta; Toyota, Kodai; Takahashi, Keita; Yada, Hiroki; Takaya, Shigeru

no journal, , 

In order to achieve both safety and economic efficiency of a nuclear power plant, it is necessary to realize rational maintenance based on characteristics of the plant. The fast breeder prototype reactor, Monju, spent most of the year for the maintenance. It is important to identify causes of the prolonged maintenance of Monju and to investigate countermeasures for implementation of rational maintenance of a next fast reactor. In this study, causes of the prolonged maintenance of Monju during reactor cold shutdown were investigated based on the plant operation of Monju. In addition, proposals for the maintenance optimization idea of a next generation fast reactor were presented to address the revealed issues.

Oral presentation

Analysis of issues related to maintenance period in the fast breeder prototype reactor Monju, 2; Analysis of plant maintenance plan

Toyota, Kodai; Hashidate, Ryuta; Takahashi, Keita; Yada, Hiroki; Takaya, Shigeru

no journal, , 

In order to achieve both safety and economic efficiency of a nuclear power plant, it is necessary to realize rational maintenance based on characteristics of the plant. The fast breeder prototype reactor, Monju, spent most of the year for the maintenance. It is important to identify causes of the prolonged maintenance of Monju and to investigate countermeasures for implementation of rational maintenance of a next fast reactor. In this study, causes of the prolonged maintenance of Monju during reactor cold shutdown were investigated based on the plant maintenance plan of Monju. In addition, proposals for the maintenance optimization idea of a next generation fast reactor were presented to address the revealed issues.

Oral presentation

Development of advanced reactor knowledge- and AI-aided design integration approach through the whole plant life cycle, ARKADIA, 2; Development plan of design optimization support tool, ARKADIA-Design

Tanaka, Masaaki; Oki, Shigeo; Miyazaki, Masashi; Takaya, Shigeru; Yokoyama, Kenji; Ando, Masanori

no journal, , 

Design optimization support tool named ARKADIA-Design for diverse nuclear power plant has been developing in Japan Atomic Energy Agency. Its development plans, goals, and schedules in the fields of core, plant structure including thermal-hydraulics, and maintenance are presented with brief introduction of progress at present.

Oral presentation

Proposal of a simple screening method which determines necessity of quantitative risk assessment for maintenance rationalization using risk information

Hashidate, Ryuta; Yada, Hiroki; Takaya, Shigeru; Futagami, Satoshi; Yamano, Hidemasa; Kurisaka, Kenichi; Enuma, Yasuhiro

no journal, , 

If components can be maintained according to a target reliability of nuclear power plants, plant safety and economic efficiency could be improved by avoiding excessive or insufficient margins. This approach can rationalize the maintenance of low target reliability components and concentrate resources (people, money, and time) on the maintenance of high target reliability components. It would take a long time to evaluate the target reliability for all components in the plant by quantitatively using probabilistic risk assessment. This paper, therefore, proposed at a first step a simple screening method which determines necessity of quantitative risk assessment for maintenance rationalization using risk information. Specifically, this method was applied to determining necessity of quantitative risk assessment to the laundry system whose function has little contributor to the plant safety of nuclear power plant, and we proposed the maintenance rationalization of the laundry system.

Oral presentation

Proposal of AI models for identifying abnormal equipment and type of abnormality

Demachi, Kazuyuki*; Chen, S.*; Dong, F.*; Yoshikawa, Masanori; Seki, Akiyuki; Takaya, Shigeru

no journal, , 

no abstracts in English

6 (Records 1-6 displayed on this page)
  • 1